Home Builders: Offset your Engineering Costs

Learn how some Home Builders have

offset engineering costs and save millions

Indicators of current Australian recession -
An opportunity for growth

Since 2019 the housing industry has been experiencing declines; government stimulus has been ineffective, and since 2019, the country’s economy has been stagnant. Yet, some Volume Builders have been outpacing the competition and kept growing. What do they have in common? Learn more in the report Shifting Economic Environments – an opportunity for growth 

- 7 min read -

{
For Metricon its always Customer service, trust and transparency. We must have the assurance that our Engineers’ services and expert advice are readily available and on hand at all times. We need to trust in their expertise and advice, to ensure we can confidently assure and correctly consult our customers.

Adele Bedggood, Operations Manager - Metricon

5 Ways to predict slab costs and win more sales in the process

Offsetting Engineering Costs in Housing Construction though Innovation. 

We have estimated that the quantitative benefits derived from our total solution and specifically our new innovation initiatives, will fund circa 50% of the investment that our clients will make for our professional services in any given year from Intrax.

These benefits do not include other advantages that can be realised from our solutions such as the improvement to reputation and customer service made possible through many of our transformative initiatives like PredictSite

Read more about how this innovation can save you thousands.

- 4 min read -

PredictSite

Get your Contour Surveys in 24 hours

To improve delivery times, Intrax has developed a product that utilises drones to survey greenfield subdivisions and deliver detailed contour surveys within 24 hours of ordering.
Having 24-hour access to contour surveys provides the project builder with a competitive advantage through the sale, design and building process.

Read more about Drone Surveying

- 5 min read -

Author 18 1
{

I have had to engage Intrax to provide alternative slab designs as I have had slabs designed by other engineers that are over the top with reinforcement, slab heights have been increased to larger pods & slabs being fully piered where not required.

Intrax were then engaged to do another soil test & engineering design & upon review of both sets of engineering, we saved our client over $15,000. 

Jonathan Brown , Regional Operations Manager -  burbank

LET'S TALK

As the pace of growth in construction is expected to decline and competition intensifies, Intrax’s operational readiness, proven capability and track record significantly reduces this uncertainty and risk.

We believe we have the best solution that will give you a strong edge over your rivals.  Shall we talk more about it?

Robert Spenceley

Robert Spenceley

National Business Development Manager

0422 992 402

robert.spenceley@intrax.com.au

Materials

Shifting Jpg

Economic Outlook

- 7 min read -

PredictSite

Slab Cost Prediction

- 4 min read -

Author 18 1

Drone Surveying

- 5 min read -

True end-to-end service

The Intrax team is composed of more than 300 highly competent consultants, engineers, surveyors and designers that work holistically under the same philosophy. When working together our level of achievement compounds to deliver a service to our clients that is second to none.

Services@300x

CONTACT US

Expert advice

Jessica Web 4

Jessica Borzillo

Business Developer Manager VIC

0430 473 885

jessica.borzillo@intrax.com.au

Renato

Graeme Clarke

Business Developer Manager NSW

0438 884 001

graeme.clarke@intrax.com.au

John Guerrera

John Guerrera

Business Developer Manager SA

0407 792 046

john.guerrera@intrax.com.au

Graham

Graham Whittaker

Business Developer Manager QLD

0449 758 835

graham.whittaker@intrax.com.au

GET UPDATES

Take part in the conversation by following us.

Intrax Logo